Planning a 2027 Smart Home Project in Ottawa: What to Sort Out This Winter
Most people call us about a smart home project when the drywall crew is already booked. That's late. The wiring decisions should have been made weeks before.
If you're renovating, building or just adding to your system next year, winter is a good time to plan. Nobody is digging, the contractors have more time to talk, and you can make decisions without a crew waiting on you. Here's what we'd sort out first.
Write down what bugs you now
Before talking about products, make a list of what doesn't work in your house today. Be specific. The Wi-Fi drops in the primary bedroom. The basement TV needs three remotes. The shades in the family room never get closed because it's a pain.
That list tells us more than a wish list does. It shows where the money will actually change your day. It also keeps the project from turning into a pile of gadgets nobody uses.
Decide what needs a wire
This is the big one if walls are opening. Some things work fine on Wi-Fi. Others really should be wired: TVs, access points, cameras, the control system and anything in the rack. Running cable to an open wall costs a fraction of fishing it through a finished one.
For new builds and gut renos, we plan home runs back to one central spot, add conduit where we expect changes later, and pre-wire for shades even if you're not buying them yet. Our pre-wire guide for Ottawa custom homes goes into cable types and locations.
Pick a home for the equipment
Every system needs a place for the network gear, the controller and the audio and video equipment. A closet, part of the mechanical room, or a basement corner. It needs power, some air flow and room to work.
Plan it now. If it's an afterthought, it ends up on a shelf in the furnace room, running hot and hard to service.
Get the network right first
Everything else rides on it. Streaming, music, cameras, door locks, the control app on your phone. A good system starts with wired access points placed for the rooms you actually use, including the garage, the deck and the basement. Our Wi-Fi and networking page explains how we design it, usually on UniFi equipment.

Lighting and shades go together
If you're replacing switches or adding pot lights, think about lighting control at the same time. Lutron keypads can replace a row of switches with buttons for scenes like Cooking, Dinner or Goodnight. Our lighting control page shows what that looks like.
Shades are easier to add when the window trim and wiring are planned for them. Even a battery shade looks better when the pocket was designed in. See motorized shading for the options we install.
Decide who runs the whole thing
A house with ten apps isn't smart. It's tiring. If you want one remote, one keypad style and one app for lights, music, TVs, shades, cameras and climate, that's what a Control4 system is for. It's easier to plan that from the start than to tie everything together later.
Set a budget with phases
You don't have to do it all in 2027. A common plan is wire everything now, then add equipment room by room over the next couple of years. The cable is the part that's hard to add later. Speakers, shades and keypads can wait.
Tell us your budget early. We'd rather design something you can afford in phases than quote a dream system you'll cut in half later.
Line up the trades
We work alongside your builder, electrician and designer. The earlier we're at the table, the fewer surprises at rough-in. Things like TV locations, speaker spots, keypad heights and where the rack goes all affect their work too.
If you've got a project coming up next year, call us at (613) 830-6787 or reach out through our contact page. We'll walk through the house or the plans with you and give you a straight answer on what's worth doing.
Frequently Asked Questions
When should I call about a 2027 renovation or new build?
As early as you have plans. Ideally before framing or before walls are opened, so wiring and equipment locations can be designed into the job instead of added after.
Can I wire the house now and add equipment later?
Yes, and it's often the smartest way to spread out the cost. Cable and conduit go in while walls are open. Speakers, shades, keypads and other equipment can be added in phases.
Do I need a full control system for a smaller project?
No. Some projects only need better Wi-Fi, a TV setup or lighting in a few rooms. We'll tell you if a control system makes sense for how you live or if a simpler setup will do.
What should I have ready before our first meeting?
A list of what bothers you about the house now, your floor plans if you're building or renovating, a rough budget, and your timeline. Photos of the rooms help too.
Do you work with my builder and electrician?
Yes. We handle the low-voltage side, like networking, audio, video, control and shade wiring, and coordinate with the electrician who handles line voltage.